Applies to Reports → Schedule in Risk Portal.
The re-trigger procedure below covers Risk reports.
Report Schedule shows accessible active schedules and recent run attempts.
The screen also provides Re-Trigger Run for eligible recent rows.
What is required before reviewing schedules?
- Access to the required report, portfolio, and market-data environments.
- A configured schedule, or a recent accessible run to inspect.
Use Report types for the separate Reports → Live workflow.
How to inspect a schedule
- Select Reports in the sidebar.
- Select Schedule. The Report Schedule page opens.
- Select Risk, VaR, or PNL.
- Locate the required Portfolio Name and Report Name in Report Run Schedule.
- Check Market Data Environments and User against the intended setup.
- Read Scheduled Time and its displayed time-zone label.
- Read Next Scheduled Run and its displayed time-zone label.
Verify the timing using both zone labels.
Scheduled Time uses the configured schedule zone.
Next Scheduled Run is displayed in the browser’s local zone.
Exports to FTP indicates configured export behavior, not confirmation that a file was delivered.
For VaR, View under Export Configurations opens the configured confidence, weighting, and row-filter details where available.
Select Close after reviewing that dialog.
How to check recent run attempts
- Locate the required entry in Recently Run Scheduled Reports.
- Check its Status, report details, and recorded dates.
- Check Completed Time, where available.
- Select that panel’s refresh icon when an updated list is needed.
The recent panel covers accessible run records created within the last five days.
It can include runs started outside a schedule.
Its refresh control updates recent attempts; revisit the page to reload the upper schedule list.
Use Report history to find and open completed results.
How to re-trigger a Risk run
Re-triggering starts another calculation and can repeat configured exports.
Review the recorded dates and settings before selecting the action.
- Select the Risk tab.
- Locate the intended entry in Recently Run Scheduled Reports.
- Check Portfolio Name and Report Name.
- Check Portfolio Date, Pricing Date, and Market Date.
- Check Live Data and Market Data Environments.
- Select Re-Trigger Run once.
The button is disabled while the row is running.
An accepted request shows a running state and Running… under Completed Time.
Acceptance confirms submission, not completed results.
Wait for processing and refresh the recent-run panel as needed.
A green check indicates success; an orange triangle indicates completion with warnings or errors.
A red failure icon indicates a failed attempt.
Check any available status details before locating completed results in Report history.
The re-trigger uses the selected Risk run’s recorded dates and settings.
It does not change the recurring schedule or advance the run to the next recurrence.
What can prevent a re-trigger?
How can a schedule be changed?
Contact the configured support contact to add, change, or stop a schedule.
This screen provides schedule inspection and run re-triggering; it has no schedule-editing form.